Multi-Cavity Injection Mold for Automotive Sensor Housing

German Tier-2 Automotive Supplier

Mold Type
Injection Mold — 4-cavity hot runner
Steel
H13 (46-50 HRC)
Cavitation
4 cavities, valve-gated hot runner
Lead Time
7 weeks from design approval to T0 samples

40% cost savings vs. German mold maker. Cycle time reduced 22% vs. original tooling.

Challenge

A German Tier-2 automotive supplier approached us to build a replacement mold for an ABS sensor housing used in a European vehicle platform. Their existing supplier — a German mold maker — quoted €48,000 for a new 2-cavity cold-runner mold with a 12-week lead time. The customer needed to reduce cost while improving cycle time for an upcoming production ramp.

What We Did

  • DFM optimization: Our engineers identified that the original 2-cavity design could be upgraded to a 4-cavity valve-gated hot runner without changing the molding machine. This doubled output per cycle with no additional equipment investment.
  • Steel selection: The sensor housing mounts in the engine bay and requires continuous operating temperature resistance. We specified H13 hot-work tool steel to handle the glass-filled PA66 material, which would have worn standard P20 or 718H within 20,000 shots.
  • Cooling optimization: Conformal cooling channels — designed in our DFM phase and machined via the factory partner's 5-axis CNC — reduced cycle time from 28 seconds (original mold) to 22 seconds. At 4 cavities × 500,000 shots per year, that 6-second reduction saves over 3,300 production hours annually.
  • Quality control: We inspected at four stages: incoming H13 spectrometer verification, in-process checks at roughing and finishing milestones, T0 sample CMM with full dimensional report, and final pre-shipment inspection including cooling circuit pressure test.

Results

MetricOriginal (German)Peifeng Precision
Tooling cost€48,000€28,500 (-40%)
Cavities24 (100% more output)
Cycle time28s22s (-22%)
Lead time12 weeks7 weeks
Mold life target300K shots500K+ shots (H13)

Customer Feedback

"Peifeng's DFM report found cooling issues in our original mold design that our German supplier never flagged. The 4-cavity upgrade they proposed paid for itself in three months of production. We now run all new mold projects through their DFM process before committing."

— Engineering Director, German Tier-2 Automotive Supplier